BPC PowerMaster Manual do Proprietário Página 8

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 24
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 7
8
Installing a new LCS system with a Base-1L
To install a new LCS system on a layout with a Base-1L Command Base:
1. Turn off power to your layout and Base-1L
2. Connect the DC wall-pack to the female cable-mount connector of the LCS DB-9 Cable.
3. Connect the DB-9 connector of the LCS DB-9 Cable to your Base-1L.
4. Connect the LCS PDI cable end of the LCS DB-9 Cable to either connector on your LCS device,
such as an LCS WiFi or LCS SensorTrack or any other Layout Control System product.
5. Restore power to your layout and Base-1L.
6. Plug in the LCS wall-pack power supply.
Your system should resemble the figure below.
Once connected and powered-up, the red LED on the Base-1L will blink once every second.
With this setup, you can control Lionel locomotives and Layout Control System products using
aCAB-1Lremote(s).
If you have additional LCS devices to install, see “Installing additional LCS devices.” If not,
skip ahead to the next section of this manual, “Configuring your LCS Device.”
Figure 5. Installing a new LCS system with a Base-1L
Installing Your First LCS Device
Vista de página 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Comentários a estes Manuais

Sem comentários